Breaking News:

Suzlon bags 105 MW order from Axis Energy Group in Andhra

NEW DELHI, Jan 6:  Wind turbine maker Suzlon Group today said that it has bagged 105 mega watt (MW) order from Axis Energy Group in Andhra Pradesh.
“The project consists of 50 units of S111 90 metre tubular tower, each with a capacity of 2.1 MW. Located in Andhra Pradesh, the project is scheduled for completion in two phases,” the company said in a BSE filing.
While, the first phase will be completed in March 2017 and the second phase will be completed in June 2017, it said.
(PTI)

related-video

Download Daily Excelsior Apps Now:

google-play-store-badgeappstore_button

Share With
This entry was posted in Business. Bookmark the permalink.