Excelsior Correspondent
JAMMU, Dec 8: Superintending Engineer (Distribution), JPDCL, O&M Circle Kathua has informed that for shitting of HT/LT Line due to widening of road at Janglote, the power supply to Janglote and PHE will remain affected on December 09, 10, 12 and 13 from 10 am to 3 pm.
Superintending Engineer O&M Circle Jammu, JPDCL has informed that for stringing of conductor, the power supply to Kishenpur, Kanyala, Kathat, Jindrah and adjoining areas will remain affected on December 09 from 10 am to 2 pm.
Similarly, for execution of pole erection and tapping work by MLAPLNP, the power supply to Shakti Nagar, Rajpura, Shiv Nagar, Patel Nagar, Kailash Nagar, Canal Road and their adjoining areas will remain affected on December 09 and 11 from 9 am to 4 pm.
Meanwhile, as per Executive Engineer, Elect. Division-I, JPDCL, Parade Jammu, that to execute LT Line work, the power supply to Residency, Gujjar Nagar, Christian Colony, Prem Nagar, Bawa Walli Gali, DPS Road and its adjoining areas will remain affected on December 09, 10, 11, 12 and 13 from 9 am to 2 pm.