Power shut down

Excelsior Correspondent
JAMMU, Sept 17: In order to carry out the work of thickening of 11 KV BB-21 feeder, the shutdown of 33 KV BB-IInd feeder emanating from 2×50 MVA, 132/33 KV Grid Station BB-IInd on  September 20, 2015 from 9:00 AM to 5:00 PM has been allowed.
The areas to be affected during the shutdown period are industrial area Bari Brahmana fed from 33 KV BB-IInd feeder.
Meanwhile, in order to carry out the work of cable laying, DB fixing and dismantling of conductor by M/s IRCON International Lt. under RAPDRP project, the power supply to Shakti Nagar (Lane No. 1,2) and Patel Nagar area will remain affected from September 18 to 24, 2015 from 8 am to 12 noon and September 27 to 30, 2015 to from 2 pm to 6 pm.