Excelsior Correspondent
KISHTWAR, May 28: A dumper vehicle along with its driver here today fell in mighty Chenab River at the construction site of Ratle Hydro Electric Project in Dharabshalla area of mountainous Kishtwar district this evening.
As per reports the Dumper bearing registration number JK08F 9581 was driven by one Faizan Ahmed of Doda moved away from the track and fell into Chenab.
Even after immediate rescue operation the driver on board the vehicle remained untraced.