Abhishek expedites developmental works at Banihal

Executive Engineer PWD Abhishek Gupta along with others during inspection of construction work.
Executive Engineer PWD Abhishek Gupta along with others during inspection of construction work.

Excelsior Correspondent

RAMBAN, Aug 7: Executive Engineer PWD (R&B) Division Ramban Abhishek Gupta along with Assistant Executive Engineer Ved Singh and concerned Junior engineers conducted an extensive tour of Banihal and inspected various ongoing construction works taken up by the department under different developmental schemes.
Asssistant Executive Engineer, PWD (R&B) Sub Division Banihal briefed the Executive Engineer about the progress of all the projects besides discussing the issues which are hindering the pace of progress.
The Executive Engineer visited various roads and buildings being constructed by the department including Meran Tethar Bridge old NHW to New NHW Lamber Road , Lambar Gujjarnar Road and Chapnari – Gudder road under NABARD, macadamized roads under city and town programme, Community Hall Building at Banihal, Buildings of ITI and DIET, Banihal besides various school buildings at Tethar and Nowgam, Residential accommodation in Dhoks at Zaban under infrastructure for the welfare of tribals.
During inspection of various developmental works being executed by the department at different levels he directed the Engineering Staff and emphasised upon officers to accelerate the pace of developmental works being executed so that they are completed within given timelines and simultaneously maintain the quality of work.
He impressed upon the officers to work with extra zeal and dedication in improving the performance in their respective sectors so as to maximise the reach of the benefits to the people.
The Executive Engineer also met with the locals to listen their issues and grievances pertaining to the PWD and resolved most of the Public issues on the spot and assured them that their genuine issues will be addressed in consultation with higher authorities.