BRO allows vehicular movement on newly launched Bailey Bridge over Chenab

Excelsior Correspondent
RAMBAN, Nov 2: The Bailey Suspension Bridge over river Chenab on Jammu Srinagar National Highway was reopened for vehicular traffic today after 57 days.
The commuters had to make a 12-kilometer detour to reach Ramban from Maitra during the bridge replacement.

Click here to watch video
Deputy Commissioner, Ramban Mussart Islam said that the new bridge was thrown open for vehicular traffic movement after successful trial run was conducted by the GREF.
According to Officer Commanding, S K Goutam the 52-Road Construction Company (RCC) of General Reserve Engineering Force (GREF), the 240 feet long timber decking reinforced Bailey Suspension Bridge (BSB) having 3.27 m carriageway width erected over Chenab River one month ahead of schedule time of completion.
He said in order to avoid undue hardships for the people of Ramban, the competent authorities have decided to throw open this bridge for vehicular traffic.
He said the bridge is suitable for carrying a load of 40T (tone) single vehicle at a time with speed limitation of 10 kilometer per hour.
The vital (suspension) bridge over river Chenab connecting the old town Ramban with District Headquarters Maitra was closed for every type of vehicular movement on 6, September 2022, after the bridge was declared unsafe by the GREF.
Locals and political leaders have expressed their gratitude to Deputy Commissioner, Mussarat Islam and concerned agencies for early completing the bridge replacement work.
Elaborating its importance, Advocate Arun Singh Raju said that early completion of the bridge work was most urgent as with the closure of this short and decades old route due to its launching, a common man was to travel about 12 kilometers via Jaswal Bridge over river Chenab at Karool to reach District Administration complex Maitra, Ramban.